We successfully installed new flooring in the small bouldering cave, as well as the transition from the old gym to the expansion. It will feel a lot more rigid than it used to, and looks brand spankin’ new!
We have a few more flooring patches that we’ll install in the next few weeks, but it shouldn’t interfere with any gym hours.
This friday we have 7 new routes in the old gym, nothing steep, mostly moderates.
Check out my new blocky 5.12- to the right of the tsunami wall… small moves on big, easy slopers and pinches!